Determination of Time, Space and Financial Parameters of the Model of Organization of Calendar Plan of Jizak Car Plant Construction, Analysis and Resource of Results

Authors

  • Begaliev Jasurbek Murodqosim O’g’li Master's student Tashkent State Transport University
  • Yusupov X.I. Scientific supervisor: D.t.s. professor. Tashkent State Transport University Tashkent, Uzbekistan

Keywords:

Construction of machine-building facilities, project model, communal, modern

Abstract

Organizing the construction of the car plant in the flow method of calendar plan modeling, creating a methodology for developing a calendar plan, identifying technical and economic advantages and applying them in design practice.

Downloads

Published

2022-05-25

Issue

Section

Articles

How to Cite

Determination of Time, Space and Financial Parameters of the Model of Organization of Calendar Plan of Jizak Car Plant Construction, Analysis and Resource of Results. (2022). Eurasian Journal of Engineering and Technology, 6, 129-131. https://geniusjournals.org/index.php/ejet/article/view/1448