Determination of Time, Space and Financial Parameters of the Model of Organization of Calendar Plan of Jizak Car Plant Construction, Analysis and Resource of Results

Main Article Content

Begaliev Jasurbek Murodqosim O’g’li
Yusupov X.I.

Abstract

Organizing the construction of the car plant in the flow method of calendar plan modeling, creating a methodology for developing a calendar plan, identifying technical and economic advantages and applying them in design practice.

Article Details

How to Cite
Begaliev Jasurbek Murodqosim O’g’li, & Yusupov X.I. (2022). Determination of Time, Space and Financial Parameters of the Model of Organization of Calendar Plan of Jizak Car Plant Construction, Analysis and Resource of Results. Eurasian Journal of Engineering and Technology, 6, 129–131. Retrieved from https://geniusjournals.org/index.php/ejet/article/view/1448