Inspection And Diagnostics Of Railway Reinforced Concrete Bridge In Andijan-Khanabad Peregon

Authors

  • U.Z. Shermuhamedov DSc, Professor, Head of department «Bridges and Tunnels», of TSTU Uzbekistan, Tashkent
  • Sh.Z. Nishonboyev Senior teacher of department «Bridges and Tunnels», of TSTU Uzbekistan, Tashkent
  • U.K. Abduraimov Senior teacher of department «Bridges and Tunnels», of TSTU Uzbekistan, Tashkent
  • F.Z. Zokirov Assistant of department «Bridges and Tunnels», of TSTU Uzbekistan, Tashkent

Keywords:

Bridge, operational period, diagnostics, monitoring

Abstract

The article presents practical recommendations for determining the load-carrying capacity of the railway reinforced concrete bridge located at 346+605 km of the Andijan railway distance Andijan-Khanabad. To ensure the safety of vehicles, it is recommended to build a new bridge or replace the main part of the bridge.

Downloads

Published

2022-08-22

Issue

Section

Articles

How to Cite

Inspection And Diagnostics Of Railway Reinforced Concrete Bridge In Andijan-Khanabad Peregon. (2022). Eurasian Journal of Engineering and Technology, 9, 77-83. https://geniusjournals.org/index.php/ejet/article/view/2070